A red brick house with natural stone surrounds being finished in falling snow in Halton Hills, and what cold weather means for fresh mortar and brickwork.

Halton Hills · New work · 2020

Prefer to text? Send us a message and we'll call you back.

New red brick house with light natural stone window and door surrounds, photographed in falling snow in Halton Hills

On February 26, 2020, snow was falling on this new house in Halton Hills while the masonry was being finished: red brick walls, light natural stone surrounds around the windows and doors, and an arched window at the front. These three photos were taken that day, and they're a good illustration of winter bricklaying, which needs more care than summer work but is done all the time in Ontario.

Winter bricklaying on a house finished in the snow

The photos show a two-storey red brick house with a symmetrical front, columns at the entry and a crisp line of stone around every opening. The ground is white, equipment is still parked in front, and snow is coming down. Nothing in the finished brickwork looks like winter work, which is the point. Done properly, brick laid in February looks and performs the same as brick laid in June.

Why fresh mortar must not freeze in winter

An NRC Canadian Building Digest on cold-weather masonry (CBD-123) explains where the risk lies. Mortar, a mix of cement or lime, sand and water, is weakest and holds the most moisture between the time it's placed in the wall and the time it has gained enough strength to resist freezing. Cement hardens by reacting with water, and that reaction slows down in the cold, so the vulnerable period gets longer in winter. Lime hardens more slowly still, by absorbing carbon dioxide from the air. At the same time, the bricks start drawing water out of the fresh mortar as soon as they touch it. If the water left in the mortar freezes too early, the joint can crack or lose its bond before it ever cures, and the damage may not show on the surface until later.

Laying bricks in cold weather: enclosures and covers

The same digest describes the usual code requirements. When the mean daily temperature falls below 40°F (about 4°C), the mortar, water and masonry units are kept at no less than 40°F while laying, and the new masonry is protected from freezing for 48 hours. No frozen materials or materials containing ice may be used, and unfinished walls are covered on top whenever work stops. On larger jobs that often means heated enclosures; on smaller ones, warm mortar and dry units. Brick Industry Association guidance adds that cold-weather admixtures are not a substitute for that protection.

Natural stone surrounds set into the brick

The light stone surrounds are natural stone, set into the brick around each window and door, including the arched window on the lower floor. Each one had to go in level and plumb with the brick coursing around it, snow or not. If you need to lay bricks on a new house and the schedule means winter bricklaying, see our brick masonry and masonry construction pages, or send us your plans through our request a quote form. We work across the GTA.

Winter bricklaying: common questions

Can bricks be laid in winter?

Yes, with the right precautions. An NRC Canadian Building Digest on cold-weather masonry notes that masonry construction now goes on all year, using heated enclosures on larger jobs and warm mortar with dry units on smaller ones. The main rules are no frozen materials and protecting fresh work from freezing.

What happens if fresh mortar freezes?

Fresh mortar is weak and full of water. If that water freezes before the mortar gains strength, the mortar can be damaged and the bond with the brick reduced. That's why fresh masonry is kept above freezing for a period after laying, and why unfinished walls are covered.